Special inspector $80, PE $145.
A prime's pre-bid brief for Escondido RFP No. 26-19.
City of Escondido, as-needed geotechnical and special inspection services for the Utilities CIP. The prime owns the field, Techtiz builds the paperwork engine.
One hard close, no cure.
A single proposal email to Randy Manns, cc Cricket Lichtenfels, by the deadline. Late electronic submissions are not accepted and there is no cure.
Published
RFP No. 26-19 released
Questions due
2:00 PM PDT
Answers posted
City responds to questions
Proposals due, 2 PM PDT
Single email. No late acceptance
Staff review
City evaluates proposals
Award
Council or designee approves
Best value, not low price. The clock is running.
As-needed, multiple-award, no guaranteed minimum.
The City may select one firm or split work across two. A single task order's $100,000 can be divided between two consultants. Funding is fiscal-year based and subject to annual appropriation.
Under Attachment A, the C.5 daily report and C.2 RFI responses are what the City's construction manager uses to track compaction data, document contractor performance, and mitigate claims. A credible bid treats the documentation as the deliverable it is.
What a remote back-office can build, and what stays on-site.
The boundary that makes a compliant Subcontracting model work on a licensed field-services contract.
Two bars, both honest. A practical and regulatory bar: field tasks need on-site, California-licensed, ICC-certified, nuclear-gauge-authorized staff under CBC Chapter 17, DIR, and IRCA, so an offshore team cannot perform them at all. A contractual gate: the anti-assignment and personnel-lock clauses require prior written City consent before any subcontracting, and City-provided materials become City property immediately.
Draft the Executive Summary narrative for the prime's review
Compile and format the five-project reference table from prime records
Format key-personnel resumes to the Attachment A categories
Build the rate-schedule template, all four components pre-labeled
Prepare the Noncollusion Declaration fields for the prime to sign
Assemble the final proposal document for the prime to review and email
After award, draft RFI technical responses for the PE to certify
Compile and format daily reports from prime-collected field data
Format lab and field test reports for the PM to submit
Draft invoices for the prime to submit
All on-site field recommendations and construction-meeting attendance
Special inspection of reinforced concrete
Trench backfill and compaction testing
Real-time deficiency notification
PE review and certification of every result
Signing and submitting the Noncollusion Declaration
Submitting all reports and invoices to the City
Custody of City as-builts, records, and raw lab data
Gates, stated plainly. A signed NDA before any City document moves. No storage of City materials on servers outside the United States without written City consent. The offshore role is a written subcontract to the US prime, with City consent obtained before any work is assigned. Pre-award support is the default lane, any post-award involvement is administrative and non-field only.
Seven ways a strong firm loses this one.
None is about engineering skill. Each is a procurement or contract trap.
Single-channel communication Before award
No contact with any City employee other than Randy Manns, with cc to Cricket Lichtenfels, before award.
Contacting anyone else is grounds for rejection. Route every question through the one channel.
Best value, not low price.
Seventy percent of the score is qualifications, experience, and references. Cost is only fifteen. The City also reserves a discretionary, unweighted interview right.
Scoring weights, out of 100
A rate-schedule competition, fixed for the term.
Time and materials, not a lump sum. Rates lock once submitted. The field technician and special inspector rates are the variable that most affects the win, since those roles are used most. Tender Insight estimates.
Special inspector $90, PE $160, PM $175. Model under NDA
Special inspector $110, PE $185.
The statutes the contract pulls in.
San Diego County courts. Government Claims Act applies.
Labor Code 1720, 1770; DIR registration under 1725.5.
Work-authorization compliance for all staff.
Governs special inspection on this work.
Order R9-2013-0001, through the indemnification clause.
92546, 92550, 92532, 95826, 91275.
Who is buying, and why.
The City of Escondido is an incorporated Council-Manager city in North County, San Diego County, incorporated 1888. The Utilities Department runs the capital program this RFP supports, across water, wastewater, recycled water, and stormwater infrastructure.

The City of Escondido is an incorporated Council-Manager city in North County, San Diego County, incorporated 1888. The Utilities Department runs the capital program this RFP supports, across water, wastewater, recycled water, and stormwater infrastructure.
Escondido City Hall. Photo: Mark Skovorodko, CC BY-SA 4.0, via Wikimedia Commons.
47 primes mapped, a long tail of boutiques.
From the prime-contractor database. A handful of national firms anchor the field, but most of the bench is mid-market and boutique shops that compete on fit. Figures are public-source estimates for partner targeting.
Four questions worth filing.
Questions the prime should consider, through the one channel. Techtiz never contacts the City.
How are resumes counted against the 20-page limit?
Page-limit treatment of resumes and appendices changes how the package is built.
Is a two-firm prime and sub arrangement acceptable?
The split-award language hints at it. Confirm before structuring the team.
Does DIR registration apply to inspection services here?
Clarify the prevailing-wage and DIR scope for this specific work.
Under NDAIs a debrief available to unsuccessful proposers?
Useful for the next pursuit, and a legitimate pre-bid ask.
Under NDAThe paperwork engine, behind your firm.
Techtiz builds the documentation. The prime owns the field, the agency relationship, and every signature. We never contact the City.
NDA before any data
A mutual NDA and written City consent before a single City document moves.
Pre-award package
Executive summary, references, resumes, and rate schedule, assembled for your review.
Post-award paperwork
RFI drafts, daily reports, and test-report formatting, after your licensed staff certify.
Your firm owns the field
All on-site work, certification, signatures, and City communication stay with the prime.
Request the full RFP-decode pack.
A US partner manager replies within one business day, under a mutual NDA, never agency-facing. Your firm holds the field, the certifications, and the City relationship.
Pre-bid brief & confidentiality
Quick answers about how to use this engagement example and what detail is available under NDA.
Why is the prime contractor name withheld?
Most SLED subcontract work sits under mutual NDA and prime branding requirements. Public summaries describe engagement type, technical surface, and outcomes. Partner names and proposal content are shared only with explicit written permission or under an executed teaming agreement.
Can Techtiz support our bid on a similar pursuit?
Yes. If your pursuit matches this engagement type, email sled@techtiz.co or use the teaming intake form. Within 1 business day a U.S.-based partner manager replies with a mutual NDA template and a calendar slot—never agency-facing.
What do we receive under NDA?
Full RFP-decode packs, compliance matrices, technical volumes, submission runbooks, and named-resume options scoped to your vehicle and timeline. Prime name, pricing, and agency data stay inside the prime boundary.
Does Techtiz contact the procuring agency?
No. Techtiz is subcontract-only and never faces the agency. Your program manager holds the client relationship, sign-off, and all agency communication.